Two-way temporary traffic lights Moorhall Road, Hillingdon

Work item: HS2-ALIGN-25-1306

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
Moorhall Road
Contractor
Align JV
Type of works
Traffic management
Estimated Start Date
05/09/2025
Estimated End Date
26/09/2025

What we are doing

We will be working to change the temporary bell mouth at our Moorhall Road site to create the permanent site entrance. The bell mouth will remain in the same location. Works will take place:

• From Friday 5 September to Friday 26September 2025

A single lane closure and two-way traffic signals on Moorhall Road are required to undertake these works,managed by temporary traffic lights on either side of the works.

Traffic management will be in place for the duration of works between 9.30am to 3.30pm to control traffic and ensure that operatives can work safely in the carriageway.