What we are doing

Vegetation maintenance from 23 August

We will be carrying out vegetation tidying and trimming at our Willesden Euroterminal site from 23 August to 7 September. During this period, we’ll carry out the following works:
• Tidy and trim the vegetation along Channel Gate Road
• Trim the trees next to the pedestrian entrance to the Willesden Euroterminal site
• Trim the trees overgrown into the site along Stephenson Street – these works will take place from inside our site only. You may notice some noise during these works while chainsaws and handheld equipment are being used to trim the trees
• Vegetation trimming between our site boundary and the fencing along Grand Union Canal

The works will take place from 8am to 6pm Mondays to Fridays and 8am to 1pm on Saturday, if needed. The dates mentioned in this notification may change – we will provide updates about our works at www.HS2inOldOak.co.uk

We will not be removing trees during these works.

Update: planter boxes on Channel Gate Road
We have installed four planter boxes on Channel Gate Road. We have agreed the types of plants to go in the planter boxes with a group of local resident representatives. The plants are currently on order and we will continue to liaise with the local resident representatives about this.

Speak with our local engagement team
You can contact our local engagement team via the HS2 Helpdesk. We are also available to speak with you at monthly virtual one to ones in Old Oak and Park Royal. The next virtual one to one will be held on Wednesday 25 August from 3pm to 6pm. To find out more and register to attend, please visit www.hs2inoldoak.co.uk

Download information relating to these works

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]