Upcoming overnight closures along section of B4118 Birmingham Road
Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Traf-37-11/07/2022
Work Item Summary
- Project Phase
- Phase 1
- Region
- Birmingham, West Midlands
- Location
- Water Orton
- Contractor
- BBV JV
- Type of works
- Pipework installation
- Estimated Start Date
- 11/07/2022
- Estimated End Date
- 16/07/2022
What we are doing
Planned works along B4118 Birmingham Road, Water Orton
Temporary three-way traffic lights are planned to be in operation during the daytime (6am – 8pm) and closed overnight (8pm – 6am) along a section of B4118 Birmingham Road, Water Orton, as shown by the orange line on the location plan overleaf, from Monday 11 July 2022 to Saturday 16 July 2022.
This is to allow us to install a specialist utility duct required for the tunnel boring machine (TBM).
Please note these dates are indicative and are subject to change at short notice.