Upcoming works at our sites on Breakspear Road South and West Ruislip – Showing location for West Ruislip

Work item: HS2-MW-SCS-Ph1-Ar-So-S2-Prog-works-3-30/10/2021

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
Breakspear Road South
Worksite Name
Breakspear Road South
Contractor
SCS JV
Type of works
Piling
Estimated Start Date
15/11/2021
Estimated End Date
28/02/2022

What we are doing

What we are doing
From 15 November 2021, we will be carrying out the following activities:

Breakspear Road South
• Construction of support structures (abutments and wingwalls) for the new bridge over Breakspear Road South.
This activity will consist of fixing the steel reinforcement and erecting the temporary shape into which the concrete will be poured.

West Ruislip
• Sheet piling installation to support the ground for the construction of West Ruislip Tunnel portal. Steel sheet piles will be installed side by side along the planned perimeter, we are planning to use a pre-auger drill to loosen the ground and then press the piles into position.
We will continue to monitor noise, dust and vibration throughout our works and ensure that adequate measures are in place to minimise disruption.