Work Item Summary
- Project Phase
- Phase 1
- Region
- Old Oak and North Acton
- Location
- Old Oak
- Worksite Name
- Old Oak Common
- Contractor
- SCS JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 17/11/2022
- Estimated End Date
- 28/02/2023
What we are doing
Utility asset protection at the Atlas Road Roundabout
Throughout 2021/22/23, HS2 contractor CSJV have been carrying out works at the Atlas Road roundabout to provide protection to utility assets prior to the construction of the Atlas Road Logistics Tunnel (ARLT).
We wrote to you on 1 August 2022 about the works on the Atlas Road roundabout being transferred over to SCSJV from CSJV in summer 2022, and again on 18 November 2022 to inform you about an extension due to unforeseen circumstances.
The utilities team have been working hard to complete these works, but they are now due to be completed by the end of February 2023. Unfortunately, in the last week, there has been additional delays to the works due to a Thames Water watermain leak separate to our works but in the same area. This has resulted in our teams needing to step down until this is rectified.
How this might affect you
Until the end of February 2023, temporary traffic management will be in place during various phases on the Atlas Road roundabout and adjacent roads.
These works will include commissioning and abandonment works for the water and gas assets below ground as well as relining the current sewer structure. Excavation works will be required but are not expected to be as significant as the previous works.
For further details please follow the link to the notification below.
Speak with our local engagement team
Our local engagement team is happy to arrange a time to speak with you via phone if you have any questions about the surveys.
Please contact the HS2 Helpdesk via the contact details below to arrange this.
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]
Download information relating to these works
Find out more about
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]