Update: hoarding artwork installation on Atlas Road site
Work item: HS2-EW-SCS-Ph1-Ar-So-S1-Prog-works-1-09/09/21
Work Item Summary
- Project Phase
- Phase 1
- Region
- Brent and Ealing
- Location
- Atlas Road
- Worksite Name
- Old Oak Common
- Contractor
- SCS JV
- Type of works
- Maintenance work
- Estimated Start Date
- 21/09/2021
- Estimated End Date
- 23/09/2021
What we are doing
Installation of hoarding artwork near roundabout on Victoria Road and Atlas roundabout
From 21 to 23 September 2021, we are planning to install a section of hoarding artwork on our Atlas Road site near the roundabout. The artwork, supported by the OPDC, has been created by Baker & Borowski with inspiration from the local community. The artwork will be installed on the above dates using handheld power tools between 8am to 6pm. For safety reasons, a partial footway closure will be in place next to our worksite hoarding. You will still be able to use the footway.
Installation of hoarding artwork near the railway bridge on Victoria Road
We have been liaising with local representatives from Midland Terrace and Shaftesbury Gardens about hoarding artwork for the section of hoarding near the Dudding Hill railway bridge and the embankment area on Victoria Road. We will install ivy artwork on this section of the site hoardings.
We are currently carrying out works in this area to install the conveyor crossing and a section of the wooden hoarding has been removed temporarily. Once this section of hoarding is replaced, we will update you with our plans to install the ivy artwork on this section of the site hoardings.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]