Update: hoarding artwork installation on Atlas Road site

Work item: HS2-EW-SCS-Ph1-Ar-So-S1-Prog-works-1-09/09/21

Work Item Summary

Project Phase
Phase 1
Region
Brent and Ealing
Location
Atlas Road
Worksite Name
Old Oak Common
Contractor
SCS JV
Type of works
Maintenance work
Estimated Start Date
21/09/2021
Estimated End Date
23/09/2021

What we are doing

Installation of hoarding artwork near roundabout on Victoria Road and Atlas roundabout

From 21 to 23 September 2021, we are planning to install a section of hoarding artwork on our Atlas Road site near the roundabout. The artwork, supported by the OPDC, has been created by Baker & Borowski with inspiration from the local community. The artwork will be installed on the above dates using handheld power tools between 8am to 6pm. For safety reasons, a partial footway closure will be in place next to our worksite hoarding. You will still be able to use the footway.

Installation of hoarding artwork near the railway bridge on Victoria Road
We have been liaising with local representatives from Midland Terrace and Shaftesbury Gardens about hoarding artwork for the section of hoarding near the Dudding Hill railway bridge and the embankment area on Victoria Road. We will install ivy artwork on this section of the site hoardings.
We are currently carrying out works in this area to install the conveyor crossing and a section of the wooden hoarding has been removed temporarily. Once this section of hoarding is replaced, we will update you with our plans to install the ivy artwork on this section of the site hoardings.