Update: Installation of artworks on Atlas Road site hoarding

Work item: HS2-EW-SCS-Ph1-Ar-So-S1-Prog works-1-30/05/2022

Work Item Summary

Project Phase
Phase 1
Region
Old Oak and North Acton
Location
Old Oak
Worksite Name
Old Oak Common
Contractor
SCS JV
Type of works
Installation Works
Estimated Start Date
06/06/2022
Estimated End Date
30/06/2022

What we are doing

Artwork installation on the Atlas Road site embankment hoarding on Victoria Road
We are preparing to install ivy artwork on the hoardings of our Atlas Road site opposite Midland Terrace during June 2022. The artwork installation will be carried out Monday to Friday between the hours of 8am to 6pm. A map showing the location of these works can be viewed on the following page.

What to expect
In preparation for these works, during the week of 6 June 2022, we will be trimming the vegetation in the embankment area to ensure that the space is safe for the workers to carry out the installation. This will also make sure we can maintain public footway access by avoiding overgrown sections through the fence on Victoria Road.
Installation of the artwork will be carried out by a small group of operatives within the embankment area using handheld power tools and working platforms to secure the art panels into place. These works should not cause any disruption to the local community.

We will continue to monitor our working methods throughout these woks to ensure they are carried out safely and with minimal disruption to the local community. Dated mentioned in this notification may change, we will provide updates at https://www.hs2.org.uk/in-your-area/map/

Speak with your engagement team
You can contact your local engagement team via the HS2 Helpdesk, all day, every day of the year. We will also be available to speak with you at monthly virtual drop-in sessions. These are held on the fourth Wednesday of each month between 3pm to 6pm – you can register to attend at www.hs2.org.uk/events/. If you are not able to attend a virtual drop-in please contact the Helpdesk so
we can arrange another time to speak with you.