Update: Installation of SCSJV conveyor system

Work item: HS2-EW-SCS-Ph1-Ar-So-S1-Prog-works-1-02/12/2021

Work Item Summary

Project Phase
Phase 1
Region
Old Oak and North Acton
Location
Old Oak
Worksite Name
Old Oak Common
Contractor
SCS JV
Estimated Start Date
06/12/2021
Estimated End Date
23/12/2021

What we are doing

Installation of conveyor bridge within the Flat Iron site
We are continuing works to install the conveyor system within SCSJV sites in the Old Oak and Park Royal area. During December 2021, we will begin to receive and install the conveyor elements within our Flat Iron site on top of the conveyor towers that have already been installed.

These works require the use of a 70-tonne crawler crane which will be used to lift and position the conveyor elements safely into place.
Work will take place during our core hours of 8am to 6pm Monday to Fridays and 8am to 1pm on Saturdays if required.

Speak with your engagement team
You can contact our local engagement team via the HS2 Helpdesk. We are also available to speak with you at monthly virtual one to ones in Old Oak and Park Royal.
To register for the next drop-in on 26 January, please visit www.hs2.org.uk/events/

If you need to speak with our local engagement team in December, please contact the HS2 Helpdesk.

There will be no construction activities taking place at our sites from Friday 24 December 2021 until Monday 3 January 2022.

During these dates, essential activities such as monitoring, maintenance and security will continue. You may notice some operatives in the local area.

Download information relating to these works

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]