Update notice for Station Approach night-time bridge inspection
Work item: HS2-EW-SCS-Ph1-Ar-So-S2-UT-2-21/3/2022_02
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- South Ruislip
- Worksite Name
- South Ruislip
- Contractor
- SCS JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 03/10/2022
- Estimated End Date
- 07/10/2022
What we are doing
What we are doing
We wrote to you earlier this year to let you know that we would be carrying out bridge inspections in March and April.
From 3 to 7 October 2022, we will be undertaking further overnight inspections, under the railway bridge on Station Approach, between 10pm and 5am. We will erect a tower scaffold within the work areas shown on the map overleaf so that we can carry out a visual inspection of the bridge. We will remove and reinstate defective brickwork where required.
How these surveys might affect you
Temporary traffic management and pedestrian crossings will be in place to ensure that we carry out the surveys safely.
We would like to apologise in advance for the disruption or inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way. We will ensure that disruption is kept to a minimum.
Your utility services will not be affected.
Download information relating to these works
Find out more about
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]