Update: Notice of night works at Long Drive
Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Prog-works-3-05/06/2021_02
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- Ruislip
- Contractor
- SCS JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 25/05/2021
- Estimated End Date
- 26/05/2021
What we are doing
What we are doing
We wrote to you previously to advise you that we would be carrying out sewer investigation works from 6 to 11 May 2021. However, we will require two additional dates to complete these works, which will now take place on 25 and 26 May 2021.
We will be carrying out sewer system investigations along Long Drive and Victoria Road, in the area shown on the map overleaf. This will help to inform our design decisions in the area.
We will investigate the condition of the sewer system using a CCTV camera mounted on a small robot. Should we find a blockage we may need to flush the drainage system using a high-pressure water jet to carry out the investigation.
How the surveys might affect you
Temporary traffic management will be in place to ensure the surveys can be carried out safely.
Your utility services will not be affected.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]