Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- Ruislip
- Contractor
- SCS JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 13/10/2021
- Estimated End Date
- 13/10/2021
What we are doing
What we are doing
We wrote to you previously to advise you that we would be carrying out utility surveys in April. However, we require additional time to complete these works which will now take place on 13 October 2021.
We will investigate the condition of the sewer system at the corner of Great Central Avenue and Cedar Avenue, in the area shown on the map overleaf. This will help to inform our design decisions in the area.
We will use a CCTV camera mounted on a small robot. Should we find a blockage we may need to flush the drainage system using a high pressure water jet to carry out the investigation.
How the surveys might affect you
Temporary traffic management will be in place to ensure the surveys can be carried out safely.
There will be no disruption to your utility service.