Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Prog-works-1-23/02/2023_03

Work Item Summary

Project Phase
Phase 1
Region
Brent and Ealing, London
Location
Mandeville Road
Worksite Name
Mandeville Road
Contractor
SCS JV
Type of works
Piling
Estimated Start Date
01/05/2024
Estimated End Date
10/05/2024

What we are doing

From 1 May until 10 May 2024, we will be installing sheet piles in our Mandeville Road site. These works will take place on the lower site level. You can see the location of the works on the map on page two. We previously installed some of the piles in this location during summer 2023. This is the final phase of piling work in this location at the site.

These works will take place during the day only. Our working times will be Monday to Friday 8am to 6pm and Saturday 8am to 1pm.

We will use a push pile method to place the piles into the ground as used previously on the embankment. We will also be using water-jetting to lubricate the piles to avoid hammering the piles in. This method is the quietest method of piling possible for this site.

The piling works are part of ongoing works to build the ventilation shafts.

Download information relating to these works

Find out more about