Update on utility works at Victoria Retail Park, South Ruislip

Work item: HS2-MW-SCS-Ph1-Ar-So-S2-UT-22-20/08/2021_04

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
South Ruislip
Worksite Name
South Ruislip
Contractor
SCS JV
Type of works
Utility works / surveys
Estimated Start Date
21/02/2022
Estimated End Date
25/03/2022

What we are doing

What we are doing
We wrote to you in September 2021, to let you know that utility works would be starting at the Victoria Retail Park. The main works have now been completed.

From 21 February to 25 March 2022, we will be digging a small trench in the loading bay at the entrance to Victoria Retail Park on Victoria Road, South Ruislip, in the area shown on the map overleaf. These works will finalise the connection of the various utility supplies into our site.

How the work might affect you
A lane closure and traffic signage will be in place to ensure the work can be carried out safely.

The Old Dairy and Victoria Retail Park will remain open during these
works.

Download information relating to these works

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]