Update on works in the Satellite Shaft at the Mandeville Road site

Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Prog-Works-1-11/11/2024

Work Item Summary

Project Phase
Phase 1
Region
Brent and Ealing
Location
Mandeville Road
Worksite Name
Mandeville Road worksite
Contractor
SCS JV
Type of works
Concrete break out, Construction, Excavation works
Estimated Start Date
27/11/2024
Estimated End Date
31/03/2025

What we are doing

Excavation and break out of concrete in the Satellite Shaft

From 27 November 2024 to late-March 2025, we will excavate and break concrete 22 metres below ground in the Satellite Shaft. These works will not take place every day during this period.

The tunnel boring machine has now passed through the Mandeville Road Satellite Shaft. We now require removing the concrete ahead of waterproofing works in the shaft.

The works will be carried out using an excavator and concrete breaker in the shaft. You may notice vibration and noise from the construction machinery. We will use noise reducing barriers to help keep noise and vibration to a minimum. We will work as efficiently as possible, while keeping our work areas safe and tidy.

For further details please see notification below.

Download information relating to these works

Find out more about

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]