Update: ongoing utility works in Willesden Euroterminal site
Work item: HS2-EW-SCS-Ph1-Ar-So-S1-Prog-works-1-25/08/2021
Work Item Summary
- Project Phase
- Phase 1
- Region
- Brent and Ealing
- Location
- Old Oak
- Worksite Name
- Old Oak Common
- Contractor
- SCS JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 13/09/2021
- Estimated End Date
- 30/10/2021
What we are doing
Site drainage works
We are continuing works to install utility connections in our Willesden Euroterminal site, including site drainage. As part of this program, we will be carrying out works along the Stephenson Street boundary of our site. These works are planned from 13 September to 30 October 2021 between the hours of 8am to 6pm on Mondays to Fridays and 8am to 1pm on Saturdays if required.
During these works we will need to break out the existing tarmac and concrete and excavate the area along the inside of our site boundary. We will then install the drainage system and backfill the excavated area. You may notice some noise during these works. We will use noise reducing barriers where possible. The site hoarding will also remain in place to assist with reducing any disruption to you. We will use water sprays to dampen down work that might cause dust.
We will continue to monitor our working methods throughout these works to ensure that disruption is minimised as much as possible.
The dates mentioned in this notification may change – we will provide updates about our works at HS2.org.uk
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]