Update: Upcoming works on Adelaide Road

Work item: HS2-EW-SCS-Ph1-Ar-So-S1-Prog-works-1-26/07/2021

Work Item Summary

Project Phase
Phase 1
Region
Camden
Location
Adelaide Road
Worksite Name
Adelaide Road
Contractor
SCS JV
Type of works
Road closure
Estimated Start Date
31/07/2021
Estimated End Date
14/08/2021

What we are doing

Road closure on Adelaide Road – 31 July and 14 August

We wrote to you in early-July advising that a road closure would be in place on Adelaide Road on Saturday 17 July and Saturday 31 July. During the road closure, site office and welfare units were planned to be installed at the eastern end of the Adelaide Road site. We also planned to remove the current welfare facilities at the western end of the site. The road closure was unable to go ahead as planned on 17 July. These works have now been rescheduled and will take place on Saturday 31 July and Saturday 14 August. On these dates, works will take place between 7am and 7pm.

How can you travel on Adelaide Road?
On 31 July a road closure will be in place on Adelaide Road between Beaumont Walk and Eton College Road. On 14 August a road closure will be in place on Adelaide Road between Eton Road and Primrose Hill Road.

On both dates, a diversion route will be clearly signed for road users. This has been agreed with Camden Council and Transport for London. Bus stops Eton Road (Stop R), Chalk Farm (Stop CB) and Chalk Farm (Stop CA) will be closed on 17 July and 31 July. The nearest bus stops for travel on bus routes 31, N28 and N31 are Finchley Road South Hampstead (Stop K) or The Roundhouse (Stop CF). Beaumont Walk residents will be able to access to their carpark during these works.

Further works on the Adelaide Road site boundary
As part of our ongoing works to install the site boundary and gates, traffic marshals using stop and go boards will be operating for one hour per day for up to two weeks starting 2 August 2021. Vehicles travelling on Adelaide Road may be asked to wait for a short period. These works will take place during our core hours which are 8am to 6pm, Monday to Friday, and 8am to 1pm Saturdays if required.
The dates mentioned in this notification may change and we will provide updates at HS2incamden.co.uk.