Update: utility works on Adelaide Road
Work item: HS2-EW-SCS-Ph1-Ar-So-S1-UT-1-05/01/202
Work Item Summary
- Project Phase
- Phase 1
- Region
- Camden
- Location
- Adelaide Road
- Worksite Name
- Adelaide Road
- Contractor
- SCS JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 23/01/2023
- Estimated End Date
- 22/02/2023
What we are doing
Adelaide Road lane closure
There will be a lane closure on Adelaide Road in front of the site boundary, opposite Beaumont Walk, from 23 January until 22 February 2023.
This closure is to allow sewer connection works to take place.
Temporary traffic lights will be in place to support the flow of traffic during the lane closure. We will also install artwork onto the site hoarding and maintenance and plumbing work will be carried out on the site welfare offices.
The bus stop between Eton Road and Chalk Farm, Stop R, will be suspended for the duration of the lane closure. We apologise for any inconvenience caused. The nearest bus stops for the 31 and N31 services are Stop P (Primrose Hill Road/Adelaide Medical Centre) and Stop CA (Chalk Farm).
The approximate location of the lane closure is shown on the map below.
Utility Works Date Changes
The utilities work in front of 74 and 76 Adelaide Road was completed on 21 December 2022. The works are not being extended into January 2023 as was previously notified.
Utility work in front of Modern Motors and the Medical Centre on Adelaide Road will start on 12 January. These works are scheduled to be completed by 22 January 2023.
There will be a lane and footpath closure outside Modern Motors and the Medical Centre. This work is to protect UK Power Network cables.
A pedestrian diversion will be in place for foot access on the opposite pavement. The approximate locations are shown on the map below.
The bus stop (Stop P) opposite the Medical Centre will be suspended for the duration of the lane closure. The nearest bus stops are on Adelaide Road between Eton Road and Chalk Farm (Stop R) and at Elsworthy Rise (Stop M).
We apologise for any inconvenience caused.
Utility Works Date Changes
The footpath closure in front of 76 and 78 Adelaide Road which had been scheduled from 27 January until 1 February 2023 has been postponed and will now take place in March 2023. Further details will be provided closer to the time.
Upcoming information events
We will be holding a face-to-face information event in on Monday, 23 January 2023:
• From 4pm to 7pm
• St Saviour’s Church, Eton Villas, London NW3 4SQ
This is an opportunity to talk to the community engagement team about our Adelaide Road site and upcoming works. We look forward to seeing you there. Further information is available on the website here: https://www.hs2.org.uk/events/
We also hold monthly virtual drop-in sessions, on the third Wednesday of every month. If you would like to book a 20-minute session to discuss the works at Adelaide Road with members of the community engagement team, please register at https://www.hs2.org.uk/events/
Download information relating to these works
Find out more about
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]