What we are doing
Ongoing works: West Gate Gas Diversion
From 18 March to 10 May, we will be carrying out gas diversion works on the footpath in front of Brentham Allotments and Meadows at both ends of the footpath. The works will take place between 8am and 6pm.
As works to strengthen and protect the gas mains ahead of future tunnelling works continue, you can view the previous notifications on the HS2 in your area map via the HS2 in Brent and Ealing webpage.
How will this affect you?
The footpath will still be open for access to Brentham Allotments and Meadows. However, we will create a pedestrian diversion for those wishing to use the footpath via the pathways between houses on Brunswick Road. The diversion route will be clearly signposted.
We will trim vegetation and trees along the entire length of footpath to allow access for handheld equipment and a five- tonne excavator.
A temporary compound will be located at Brentham Allotment Gates. Access to Brentham Allotments and Meadows will be available at all times.
We will use noise reducing barriers where possible to help minimise any noise in the local community, working as efficiently as possible whilst keeping our work areas safe and tidy.