Update: works within the Adelaide Road Site

Work item: HS2-EW-SCS-Ph1-Ar-So-S1-UT-1-02/11/2022

Work Item Summary

Project Phase
Phase 1
Location
Adelaide Road
Worksite Name
Adelaide Road
Contractor
SCS JV
Type of works
Utility works / surveys
Estimated Start Date
07/11/2022
Estimated End Date
21/11/2022

What we are doing

Utility works within the Adelaide Road Site

As part of the ongoing works within our Adelaide Road site, we would like to inform you of utility works within the site boundary.

From 7 November, for up to two weeks, works will take place to install a UK Power Network duct, and to install a Thames Water connection to supply water to the site.

This work will involve breaking concrete, and additional noise may be heard.  Noise mitigation barriers will be in place, and we will continue to monitor noise levels.

Speak to our local engagement team

You can book a 20-minute slot between 3pm to 6pm to speak with our local engagement team from HS2 and SCSJV on the third Wednesday of every month. To register your attendance for one of our virtual drop-ins, please visit HS2.org.uk/events

Alternatively, you can contact the HS2 Helpdesk to arrange another suitable time to speak with us.

Download information relating to these works

Find out more about

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]