Work item: HS2-EW-SCS-Ph1-Ar-So-S1-UT-1-02/11/2022
Work Item Summary
- Project Phase
- Phase 1
- Location
- Adelaide Road
- Worksite Name
- Adelaide Road
- Contractor
- SCS JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 07/11/2022
- Estimated End Date
- 21/11/2022
What we are doing
Utility works within the Adelaide Road Site
As part of the ongoing works within our Adelaide Road site, we would like to inform you of utility works within the site boundary.
From 7 November, for up to two weeks, works will take place to install a UK Power Network duct, and to install a Thames Water connection to supply water to the site.
This work will involve breaking concrete, and additional noise may be heard. Noise mitigation barriers will be in place, and we will continue to monitor noise levels.
Speak to our local engagement team
You can book a 20-minute slot between 3pm to 6pm to speak with our local engagement team from HS2 and SCSJV on the third Wednesday of every month. To register your attendance for one of our virtual drop-ins, please visit HS2.org.uk/events
Alternatively, you can contact the HS2 Helpdesk to arrange another suitable time to speak with us.
Download information relating to these works
Find out more about
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]