Skip to main page content
View route map

Utilities installation at station site entrance

Work item: HS2-MW-BBVS-Ph1-OOC-St-S4-CR-24-18/02/2025

Work Item Summary

Project Phase
Phase 1
Region
Old Oak and North Acton
Location
Old Oak Common lane
Worksite Name
Old Oak Common
Contractor
BBVS JV
Type of works
Utility Works
Estimated Start Date
18/04/2025
Estimated End Date
11/05/2025

What we are doing

Site entrance work starting this month

We will be installing utility cables and pipes just inside the main entrance to the Old Oak Common station site. This involves excavating trenches, installing services, re-filling the trenches and reinstating the road surface. There may be some noise from the machinery used and fencing and noise barriers will be in place. This work to re-route cables and pipes is a key part of the preparation for the new Old Oak Common station.

This work will take place over weekends and bank holidays:

  • Friday 18 April to Monday 21 April (Easter weekend): 8am-7pm
  • Saturday 26 and Sunday 27 April: 8am-1pm
  • Saturday 3 and Sunday 4 May: 8am-7pm
  • Monday 5 May (bank holiday): 8am-7pm
  • Saturday 10 and Sunday 11 May: 8am-1pm

We need to use public holidays and weekends when there will be no deliveries to the site.

Please see the link below for further information.

Download information relating to these works

Find out more about

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]