Work item: HS2-MW-MD-Ph1-Eu-St-S3-Site-11-28/01/2022

Work Item Summary

Project Phase
Phase 1
Region
Camden, London
Location
Camden, Euston station
Contractor
Mace Dragados JV
Type of works
Footpath diversion, Gas pipeline diversion, Ground investigations, Utility works / surveys
Estimated Start Date
21/03/2022
Estimated End Date
31/05/2022

What we are doing

Utilities works to the West of Euston Station:

Below is a summary of three areas of work covered in this notice. To minimise disruption, we are undertaking works concurrently in the same location. Please continue to read the rest of this notification for further information about each part.

Ground Investigation and Trial Holes
We will carry out further surveys at Cobourg St, Drummond Street, Euston Road and Gordon Street. This helps plan the upgrade works required for water and gas pipes.

Sewer condition and connectivity investigation
We are progressing with these works and will undertake further surveys at the junction of Coburg Street / Starcross Street, junction of Coburg Street / Drummond Street, Euston Street, Stephenson Way and Eversholt Street. These surveys are necessary to determine the condition and locations for future sewer works in preparation of the HS2 Euston station.

Utilities to the East and West of Euston Station
From April 2022, we will begin the main utilities works which will be intermittent. These works will be in the following areas; Hampstead Road, Robert Street, North Gower Street, Coburg Street, Starcross Street, Drummond Street, Euston Street, Stephenson Way, Euston Road, Gordon Street, Eversholt Street and Doric Way.

Download information relating to these works