Victoria Road Crossover Box site plantroom piling works

Work item: HS2-SCS-26-1629

Work Item Summary

Project Phase
Phase 1
Region
Brent and Ealing
Location
Victoria Road
Worksite Name
Victoria Road Crossover Box
Contractor
SCS JV
Type of works
Piling
Estimated Start Date
02/02/2026
Estimated End Date
27/02/2026

What we are doing

We will be drilling and installing reinforced concrete piles into the ground. This work helps strengthen the ground and provides solid foundations for future plantroom construction (a plantroom is a building containing electrical and other systems).

Location

Victoria Road Crossover Box site, North Acton, London

Duration

Monday 2 February to Friday 27 February 2026 7am to 6pm

What to expect

You may experience some daytime noise from the excavator, piling rig and crane, as well as general construction noise from concrete pours and other site activities. Where possible and if required, we will use noise reducing barriers and dust suppression measures to help minimise any disruption.

HS2 is undergoing a comprehensive reset to ensure it can be built efficiently and for the lowest reasonable cost. This work is being carried out in stages and will be completed in 2026. We will provide you with updates on the reset and what this means for our plans to build the railway in your area.

Download information relating to these works

Find out more about

    If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]