What we are doing

Weekend works behind our hoarding next to 1 Park Village East – 10 and 11 August

We need to complete protective works to a number of buildings ahead of our major excavations and tunnelling works.

From August until the end of September we will install temporary protective equipment to 1 Park Village East. On 10 and 11 August we will set up a working platform behind our hoarding next to 1 Park Village East to help carry out this work. We will work from 8am to 5pm on Saturday and 10am to 4pm on Sunday to do this. We need to install this platform during the weekend, when there are no works below, for safety reasons.

We will use hand tools so do not expect these works to be noisy. However, we will continually monitor our noise levels to ensure we are working within the approved limits.

We apologise in advance for any disturbance these works may cause.

Weekend works at Granby Terrace bridge – 10 August

We are currently working to extend Granby Terrace bridge.

On Saturday 10 August, we will work extended hours, from 8am to 5pm. We will complete all noisy works between the hours of 8am and 1pm and use acoustic blankets where possible.

For further details of above works, please see notification below.

Download information relating to these works

Find out more about