Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- West End Road
- Worksite Name
- South Ruislip
- Contractor
- SCS JV
- Type of works
- Bridge inspections
- Estimated Start Date
- 28/11/2022
- Estimated End Date
- 28/11/2022
What we are doing
What we are doing
We will be carrying out an inspection of the railway bridge on the junction of West End Road and Bedford Road on 28 November.
We will erect a tower scaffold within the work area shown on the map below so that we can carry out a visual inspection of the bridge. Due to the location of the bridge to the new tunnels route, we need to understand whether additional protection or strengthening works need to be in place before tunnelling early next year.
How these surveys might affect you
A footpath closure, pedestrian diversion and temporary crossings will be in place to ensure that we can carry out the surveys safely.
We would like to apologise in advance for any disruption or inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way.
We will ensure that disruption is kept to a minimum.