West End Road bridge strengthening works
Work item: HS2-EW-SCS-Ph1-Ar-So-S2-OTH-1-09/01/23
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- South Ruislip
- Worksite Name
- South Ruislip
- Contractor
- SCS JV
- Type of works
- Bridge protection works
- Estimated Start Date
- 09/01/2023
- Estimated End Date
- 17/02/2023
What we are doing
What we are doing
We will be carrying out strengthening works to the railway bridge on the junction of West End Road and Bedford Road starting on 9 January 2023 until 17 February 2023.
We will erect a tower scaffold within the work area shown on the map overleaf and a safety zone around it so we can carry out the bridge strengthening works. These works need to take place in advance of the tunnelling works in Spring 2023.
How these works might affect you
Safely segregating the worksite from traffic necessitates a narrowing of the northbound lane. Two-way traffic will be maintained throughout. A footpath closure, pedestrian diversion and temporary crossings will also be in place.
We would like to apologise in advance for any disruption or inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way. We will ensure that disruption is kept to a minimum.