West End Road night-time utility surveys, bridge inspection and monitoring studs installation

Work item: HS2-EW-SCS-Ph1-Ar-So-S2-UT-1-21/3/2022

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
South Ruislip
Worksite Name
South Ruislip
Contractor
SCS JV
Type of works
Bridge inspections, Utility works / surveys
Estimated Start Date
04/04/2022
Estimated End Date
05/04/2022

What we are doing

What we are doing
Overnight on 4 and 5 April 2022, we will be carrying out works under the railway bridge on West End Road and the Bedford Road junction.

The utility investigations will involve the use of CCTV cameras and scanning equipment to identify the utilities located in the areas shown on the map overleaf.

We will also be inspecting the railway bridge. We will erect a tower scaffold within the work areas shown on the map, so that we can carry out a visual inspection of the bridge.

We will be using a small hammer to install monitoring studs in the joints between the kerb and paving slabs. Any noise will be minimal and very brief.

How these surveys might affect you
Temporary traffic management and pedestrian crossings will be in place to ensure that we carry out the surveys safely.

We would like to apologise in advance for the disruption or inconvenience this may cause. Every effort is being taken to ensure that these works are carried out in the least impactful way. We will ensure that disruption is kept to a minimum.

Your utility services will not be affected.