Skip to main page content
M6 South viaduct deck after the first launch.

Britain’s new high-speed railway

M6 South viaduct deck after the first launch.

Construction

Building the railway

HS2 is Britain’s biggest infrastructure project. The railway runs for about 140 miles, with four new stations and two depots. In total, we’re constructing 681 structures – including viaducts, bridges, cuttings and embankments as well as tunnels stretching for more than 32 miles in total.

Four joint ventures are building the railway between London and HS2’s connection to the West Coast Main Line in Staffordshire. Three contractors are leading our stations programme.

What we're building

Our construction programme includes 52 high-speed trains, three new stations, two depots and 140 miles of new railway.

We’re boring more than 32 miles of tunnels to protect landscapes and reduce disruption. Across the route, we’re building 169 bridges and 52 viaducts, and shaping the landscape through 110 embankments and 71 cuttings. Power and signalling systems will support safe, reliable high-speed services throughout.

HS2 works near you

Sign up for updates about construction in your area. We’ll tell you what we’re building, when we’re working and what we’re doing to reduce disruption.

Subscribe to local works updates