Calvert Infrastructure Maintenance Depot
We’ll also use the depot to store and maintain on-track maintenance machines, train maintenance staff, and provide support when incidents happen on the main line.
Building the depot will create new public green spaces, footpaths and jobs for local people.
Inside, we’re creating healthy workspaces with plenty of natural light and air. Landscaping throughout the site helps us meet our sustainability goals.
The depot will achieve at least a BREEAM ‘Excellent’ rating through:
- net zero energy use
- local materials
- green infrastructure
- water harvesting technology
We’re creating biodiverse wetlands and ecological ponds north of the depot as part of our drainage system. You’ll be able to access these new green spaces via footpaths linking to the wider landscape.
HS2 works near you
Sign up for updates about construction in your area. We’ll tell you what we’re building, when we’re working and what we’re doing to reduce disruption.








