HS2 Phase One information papers: construction (series D)
An outline of the construction methods, design, security and timetable for HS2 Phase One (London to the West Midlands).
These documents describe:
- an indication of the likely effects on existing rail passenger services
- how access to residential and commercial property as a result of temporary interference with the highway will be maintained during construction works for High Speed Two (HS2) railway
- what will be done to mitigate any risks of disruption to public utilities during construction
- the need for shafts along tunnels and porous portals
- the construction timetable for Phase One of HS2, including an overview of the main stages and a timeline to the start of services
- the working hours for the construction