Skip to main page content
View updates

An outline of the construction methods, design, security and timetable for HS2 Phase One (London to the West Midlands).

These documents describe:

  • an indication of the likely effects on existing rail passenger services
  • how access to residential and commercial property as a result of temporary interference with the highway will be maintained during construction works for High Speed Two (HS2) railway
  • what will be done to mitigate any risks of disruption to public utilities during construction
  • the need for shafts along tunnels and porous portals
  • the construction timetable for Phase One of HS2, including an overview of the main stages and a timeline to the start of services
  • the working hours for the construction

Collection history

Published:
29/07/2014