Skip to main page content

Indirect contracts found 1840

A list of current and future indirect contract opportunities.
Tier 2 Contractor Tier 2 Package Tier 2 Package Value Contact email for procurement enquiries
EQUIBProvision of Risk Manager£0m - £1m[email protected]
EQUIBRisk Management£1m - £10m[email protected]
EQUANSFacilities management£1m - £10m[email protected] [email protected] [email protected]
ENTREPOSE MILLS SCAFFOLDINGPiers/Abutments access staircases£0m - £1m[email protected]
ENTREPOSE MILLS SCAFFOLDINGPSV - Scaffold£0m - £1m[email protected]
ENITIALGroundwater Monitoring£1m - £10m[email protected]
ENGLOBE REGENERATION UK LIMITEDMBL Middle Bickenhill Landfill Ground Remediation£1m - £10m[email protected]
ENGLOBE REGENERATION UK LIMITEDINNS Stock Piles - Disposal£0m - £1m[email protected]
ENGLOBE REGENERATION UK LIMITEDMDU- Ground water remediation£0m - £1m[email protected]
ENGINEERS MATESaltley Overbridge Architectural Finishing’s£1m - £10mAndy Bowyer
Engage Process LimitedCloud Based Process Management Platform£0m - £1m
EMT (MOBIBIZ)Asset Information & Handover Tool£0m - £1m[email protected]
EMT (MOBIBIZ)Field Data Management£0m - £1m[email protected]
EMT (MOBIBIZ)Asset Information & Handover Tool£0m - £1m[email protected]
EMJ PLASTICSGRP Bridge Panels & Walkways - Supply Only£0m - £1m[email protected]
EMJ PLASTICSPermanent Glass Reinforced Plastic Formwork£0m - £1m[email protected]
EMJ PLASTICSPermanent Formwork Design & Supply System£0m - £1m[email protected]
EMJ PLASTICSPermanent GRP Formwork - A46£0m - £1m[email protected]
Emico LimitedEarthing Installation (Area Central))£0m - £1m[email protected]
Emico LimitedEarthing Installation (West Ruislip)£0m - £1m[email protected]
Emico LimitedHV Substations (Area Central)£1m - £10m[email protected]
Emico LimitedHV Substations (Area West)£1m - £10m[email protected]
Emerson Crane Hire LimitedMobile Crane Hire & Contract Lifts£1m - £10m[email protected]
Elliot Group LimitedTemporary Accomodation - Lorry Holding Area Euston£0m - £1m[email protected]
ELCOM PROJECTSEarthing and Bonding£0m - £1m[email protected]
Eiffage Metal UK LimitedProvision of all necessary management, labour, plant,access, materials and supervision to carryout and complete fabrication drawings, manufacture, supply, transport, delivery and installation of the structural steel for viaducts and overbridges within multiple sections.£10m - £50m[email protected]
Ehabitation LtdWeather risk software£0m - £1m[email protected]
EH SMITH (BUILDERS MERCHANTS)Builder's Merchants£1m - £10m[email protected] [email protected]
Eden SpringsWatercoolers[email protected]
Ed. Zublin AGS2 Diaphragm Walling£10m - £50m[email protected]
Ed. Zublin AGiTWO (2026 Renewal)£0m - £1m[email protected]
Ed. Zublin AGiTWO£1m - £10m
ECUSprovision of GCN ecologist£0m - £1m[email protected]
Ecosulis Ltdland maintenance which includes visual insections, reporting, fence and gate maintenance, grass and hedgerow cutting and maintenance.£0m - £1m[email protected]
Earthworks and Materials Solutions LimitedProfessional Services Agreement for the technical and commercial advice on materials related matters, associated with earthworks, site won and imported aggregates, site batched concrete, processing, contaminated land and testing£0m - £1m[email protected]
E ASTON & SONSL4 Day rate tippers - Aston£0m - £1m[email protected]
E ASTON & SONDay rate Tippers for carrying material from WWH to Delta£1m - £10m[email protected]
Dywidag Ritchies Joint Venture (DRJV)Supply and installation of instrumentation equipment to monitor the Chipping Warden Green Tunnel excavation works - Drilling 102 bore holes, installing extensometers, inclinometers, piezometers & data logging stations£1m - £10m[email protected] & [email protected]
Dywidag LimitedSmall Heath Network Rail Bridge track monitoring Option 2 Tilt Sensors£0m - £1m[email protected] & [email protected]
DYNAMIC OPERATIONS E-LEARNINGeLearing£0m - £1m
Duradiamond Healthcare LtdOccupational Health Services£1m - £10m[email protected], [email protected]
DURA COMPOSITESSaltley GRP Bridge Walkway£1m - £10m[email protected] [email protected]
DURAManufacture and Supply of the DURA Walkways for G2S and the associated brackets and fixings£0m - £1m[email protected]
Duo Operations LimitedFinmere Borrow Pit Earthworks and Processing and Processing in Cuttings£10m - £50m[email protected] & [email protected]
Duo Operations LimitedEarthworks (WTS, South SPA & Backfill of Copthall Tunnel)£10m - £50m[email protected]
DUO OPERATIONSMain Earthworks£10m - £50m[email protected] [email protected]
DUO OPERATIONSWWHD Temporary Brook Diversion£1m - £10m[email protected] [email protected]
DUNTON ENVIRONMENTALBio Remediation£1m - £10m[email protected]
DUNTON ENVIRONMENTALAsbestos Management Plan (Sublot 4)[email protected]
DUNTON ENVIRONMENTALD-wall contamination ground excavation£0m - £1m[email protected]