Indirect contract opportunities
We publish information on key awarded tier 2 subcontracts within our supply chain and encourage interested suppliers to get in touch using the contact details provided.
We also publish details of live and upcoming subcontract procurements to be undertaken by our tier 1 contractors, to provide early visibility of opportunities to the market.
Apply for live indirect contract opportunities on CompeteFor
Downloadable tier 2 awarded contracts AND tier 1 contractor procurement pipeline
Indirect contracts found 1840
| Tier 2 Contractor | Tier 2 Package | Tier 2 Package Value | Contact email for procurement enquiries |
|---|---|---|---|
| Joseph Gallagher Limited | Pipe Jacking (Ickenham Road South) | £1m - £10m | [email protected] |
| JR Hoarding and Fencing Limited | Temporary Hoarding (West) | £0m - £1m | [email protected] |
| K & T Ward Trading as Thames Valley Vulcanising Services | Belt Vulcanising (West) | £0m - £1m | [email protected] |
| K R CONTRACTS | Temporary removal and subsequent reinstatement of Heritage Bridge Wingwall to make space for temporary works related to Viaduct Deck. | £0m - £1m | [email protected] |
| KALLIDUS | Gamification of 'The Deal' | £0m - £1m | |
| Kee Process Limited | Commissioning of the foul treatment plant and pump system at A423, ongoing sampling for the duration of EKFB works | £0m - £1m | [email protected] |
| Keller Limited | Shaft Grouting Array | £1m - £10m | [email protected] |
| Keller Limited | PVE Wall Mitigation Works | £1m - £10m | [email protected] |
| Keller Limited | Ground Anchors | £1m - £10m | [email protected] |
| Kelly Formwork (UK) Limited | Noise Barrier FRC Torsion Beam | £1m - £10m | [email protected] |
| Kelly Formwork (UK) Limited | Formwork - Area East | £10m - £50m | [email protected] |
| KELTBRAY BUILT ENVIRONMENT | FRC Package 3 - Viaducts (River Blyth / Ballsall Common / Marsh Farm) | £50m - £100m | [email protected] |
| KELTBRAY BUILT ENVIRONMENT | Roadworks Package 1 - A429 | £1m - £10m | [email protected] |
| KELTBRAY BUILT ENVIRONMENT | Track Drainage - Package 1 | £1m - £10m | [email protected] |
| KELTBRAY BUILT ENVIRONMENT | Backfill Package 4 (Viaducts) | £1m - £10m | [email protected] |
| KELTBRAY BUILT ENVIRONMENT | A452 Kenilworth Road Slip Road | £0m - £1m | [email protected] |
| KELTBRAY BUILT ENVIRONMENT | Milburn Grange Farm Access Track | £0m - £1m | [email protected] |
| Keltbray Built Environment Ltd | Piling Main Works | £10m - £50m | [email protected] |
| Keltbray Limited | GTB Demolilition of Retaining Wall and Earthworks | £0m - £1m | [email protected] |
| Keltbray Limited | Asbestos Removal DB Cargo Shed | £0m - £1m | [email protected] |
| Keltbray Limited | Area Central Piling Package | £1m - £10m | [email protected] |
| Keltbray Ltd | Remediation of stockpiled (by previous occupiers) excavated material which contains asbestos | £0m - £1m | [email protected] |
| Kenton Black Limited | Provision of Estimating Resource | £0m - £1m | [email protected] |
| Kern Tunneltechnik Limited | OOC Secondary Lining Formwork | £1m - £10m | [email protected] |
| Kern Tunneltechnik Limited | NTE Cross Passages - SCL Formwork - DOV - Turntable Bogies | £1m - £10m | [email protected] |
| Kern Tunneltechnik Limited | NTE Cross Passages - SCL Formwork | £0m - £1m | [email protected] |
| Kern Tunneltechnik Limited | Rubber Tyred Gantry Crane - Euston Tunnels | £0m - £1m | [email protected] |
| Kern Tunneltechnik Limited | NTW Cross Passages - SCL Formwork | £0m - £1m | [email protected] |
| KERN Tunneltechnik Ltd | Supply of Robust Kerb formwork Shutters for GW & CW green tunnels | £1m - £10m | [email protected] |
| KEYLINE CIVILS SPECIALIST | Geogrid/Geotextiles for Piling Platforms | £0m - £1m | [email protected] [email protected] [email protected] |
| KEYLINE CIVILS SPECIALIST | Supply of Geogrid/Geotextiles for PSV Colehill Platforms | £0m - £1m | [email protected] [email protected] [email protected] |
| KEYLINE CIVILS SPECIALIST | Supply of TX170 Geogrid (4x50m) forPSV River Tame Viaducts Piling Platforms | £0m - £1m | [email protected] [email protected] [email protected] |
| KEYLINE CIVILS SPECIALIST | Supply of Geogrid/Geotextiles for PSV Coleshill West Piling Platforms | £0m - £1m | [email protected] [email protected] [email protected] |
| KEYLINE CIVILS SPECIALIST | Attleboro Farm Embankment - Geogrids for LTP | £0m - £1m | [email protected] [email protected] [email protected] |
| KEYLINE CIVILS SPECIALIST | Requisition 150100063470 / Marsh Lane Embankment / Geogrid | £0m - £1m | [email protected] [email protected] [email protected] |
| KEYLINE CIVILS SPECIALIST | Pool Wood Embankment Geotextile | £1m - £10m | [email protected] [email protected] [email protected] |
| KEYLINE CIVILS SPECIALIST | Builder's Merchants | £1m - £10m | [email protected] [email protected] [email protected] |
| KEYSTONE ENVIRONMENTAL | Ecological Mitigation Sites Delivery – Aftercare, Maintenance & Monitoring 2023 | £1m - £10m | [email protected] |
| Kier Facilities Services Ltd | Provision of FM (Interim) | £0m - £1m | [email protected] |
| Kier Highways Limited | A43 Sequencing & Temporary Works Design | £0m - £1m | [email protected] |
| Kier Integrated Services Limited | Utility Diversions | £1m - £10m | [email protected] |
| Kier Professional Services Limited | Temporary Works Design | £1m - £10m | [email protected] |
| Kier Transportation Limited | QUA 36 FRC Works | £1m - £10m | [email protected] |
| Kier Transportation Limited | Calvert North Structures & Earthworks | £50m - £100m | [email protected] |
| Kilnbridge | Link Bridge between adjacent buildings | £0m - £1m | |
| KILNBRIDGE CONSTRUCTION SERVICES | D-Wall Cutting | £1m - £10m | [email protected] [email protected] [email protected] |
| KILNBRIDGE CONSTRUCTION SERVICES | BROT IS - Shaft internal lining walls | £1m - £10m | [email protected] [email protected] [email protected] |
| KILNBRIDGE CONSTRUCTION SERVICES | Pile Cropping | £1m - £10m | [email protected] [email protected] [email protected] |
| KILNBRIDGE CONSTRUCTION SERVICES | SD & RW – Ancillary tasks | £0m - £1m | [email protected] [email protected] [email protected] |
| KILNBRIDGE CONSTRUCTION SERVICES | WWH Pile Cropping | £0m - £1m | [email protected] [email protected] [email protected] |