Indirect contracts found 1594

Tier 2 Contractor Tier 2 Package Tier 2 Package Value Contact email for procurement enquiries
Kuka Robotics UK LimitedRobot Arm Maintenance£0m - £1m[email protected]
KTL HEAVY ENGINEERING LTD.BROT EP - Disassembly of STPs£1m - £10m[email protected]
KTL HEAVY ENGINEERING LTD.LIW/BROT Disassembly/assembly of STP£0m - £1m[email protected]
KRINGS INTERNATIONAL FRANCEPSV – Shoring & Excavation System – Trench Box£0m - £1m[email protected] [email protected]
Konvergent LtdFor the provision of Solution and Integration Architects£0m - £1m[email protected]
Knutsford Safety LLPProfessional Services to support management of Covid 19£0m - £1m[email protected]
Kingspan Water and Energy Ltd T/A Kingspan Water and Energy ServiceKingspan Water and Energy will provide the commissioning, servicing and emptying of all treatment plants and oil/petrol separators/interceptors. it is our responsibility to service the mechanical and electrical components of al our own manufactured units.£1m - £10m[email protected]
KING LIFTINGPSV Long term hiring cranes£1m - £10m[email protected] [email protected]
Kilnbridge Construction Services LtdDrilling connector bars to extend temporary crossings£0m - £1m[email protected]
Kilnbridge Construction Services LtdFormwork, rebar and concrete works, to include craneage, scaffolding, concrete pumps for the SM116a Underpass in G2S Central£0m - £1m[email protected]
Kilnbridge Construction Services LtdFRC works£1m - £10m[email protected]
Kilnbridge Construction Services LtdAMS T Wall Install£1m - £10m[email protected]
Kilnbridge Construction Services LimitedFRC - Copthill (Area West)£10m - £50m
Kilnbridge Construction Services LimitedConcrete Drilling and Coring (Central)£0m - £1m
Kilnbridge Construction Services LimitedConcrete Drilling and Coring (West)£0m - £1m
Kilnbridge Construction Services LimitedFirestopping (Framework)£0m - £1m[email protected]
Kilnbridge Construction Services LimitedStructural Steel for Copthall Headhouse£0m - £1m[email protected]
KILNBRIDGE CONSTRUCTION SERVICESD-Wall Cutting£1m - £10m[email protected] [email protected] [email protected]
KILNBRIDGE CONSTRUCTION SERVICESBROT IS - Shaft internal lining walls£1m - £10m[email protected] [email protected] [email protected]
KILNBRIDGE CONSTRUCTION SERVICESPile Cropping£1m - £10m[email protected] [email protected] [email protected]
KILNBRIDGE CONSTRUCTION SERVICESSD & RW – Ancillary tasks£0m - £1m[email protected] [email protected] [email protected]
KILNBRIDGE CONSTRUCTION SERVICESWWH Pile Cropping£0m - £1m[email protected] [email protected] [email protected]
KILNBRIDGE CONSTRUCTION SERVICESLIW/BROT - Cross Passages Openings£0m - £1m[email protected] [email protected] [email protected]
KILNBRIDGE CONSTRUCTION SERVICESBROT IS - Cable Adits & Ventilation Adits Diaphragm Wall Coring and Cutting for Adit Excavation​£0m - £1m[email protected] [email protected] [email protected]
KILNBRIDGE CONSTRUCTION SERVICESBROT IS - Depressurisation Works (Tunnel Side)£0m - £1m[email protected] [email protected] [email protected]
Kier Transportation LimitedCalvert North Structures & Earthworks£50m - £100m[email protected]
Kier Transportation LimitedQUA 36 FRC Works£1m - £10m[email protected]
Kier Professional Services LimitedTemporary Works Design£1m - £10m[email protected]
Kier Integrated Services LimitedContestable Utility Diversions£1m - £10m[email protected]
Kier Integrated Services LimitedWest Street Doddershall£1m - £10m[email protected]
Kier Integrated Services LimitedComplete installation of the Temporary diversion design£1m - £10m[email protected]
Kier Integrated Services LimitedUtilities diversions£1m - £10m[email protected]
Kier Integrated Services LimitedVegitation Clearance Works£1m - £10m[email protected]
Kier Integrated Services LimitedUtilities diversions£1m - £10m[email protected]
Kier Integrated Services LimitedSite access road surfacing works£0m - £1m[email protected]
Kier Integrated Services LimitedUtility Diversions£0m - £1m[email protected]
Kier Integrated Services LimitedUtility Diversions£0m - £1m[email protected]
Kier Integrated Services LimitedPreconstruction activities for the Contestable Utility Diversions to Doddershall & Station Road£0m - £1m[email protected]
Kier Integrated Services LimitedUtility Diversions - Early Contractor Involvement Greatworth to Southam£0m - £1m[email protected]
Kier Integrated Services LimitedUtility Diversions - Early Contractor Involvement Twyford to Greatworth£0m - £1m[email protected]
Kier Integrated Services Limited238.D - A423 Banbury Road Overbridge Multi-Utility Temporary Diversions£0m - £1m[email protected]
Kier Integrated Services LimitedSupply and Installation of utility diversion works including all necessary testing and commissioning.£100m - £250m[email protected]
Kier Highways LimitedA43 Sequencing & Temporary Works Design£0m - £1m[email protected]
Kier Facilities Services LtdProvision of FM (Interim)£0m - £1m[email protected]
KEYSTONE ENVIRONMENTALEcological Mitigation Sites Delivery – Aftercare, Maintenance & Monitoring 2023£1m - £10m[email protected]
KEYLINE CIVILS SPECIALIST Pool Wood Embankment Geotextile£1m - £10m[email protected] [email protected] [email protected]
KEYLINE CIVILS SPECIALISTBuilder's Merchants£1m - £10m[email protected] [email protected] [email protected]
KEYLINE CIVILS SPECIALISTGeogrid/Geotextiles for Piling Platforms£0m - £1m[email protected] [email protected] [email protected]
KEYLINE CIVILS SPECIALISTSupply of Geogrid/Geotextiles for PSV Colehill Platforms£0m - £1m[email protected] [email protected] [email protected]
KEYLINE CIVILS SPECIALISTSupply of TX170 Geogrid (4x50m) forPSV River Tame Viaducts Piling Platforms£0m - £1m[email protected] [email protected] [email protected]