Indirect contract opportunities
We publish information on key awarded tier 2 subcontracts within our supply chain and encourage interested suppliers to get in touch using the contact details provided.
We also publish details of live and upcoming subcontract procurements to be undertaken by our tier 1 contractors, to provide early visibility of opportunities to the market.
Apply for live indirect contract opportunities on CompeteFor
Downloadable tier 2 awarded contracts AND tier 1 contractor procurement pipeline
Indirect contracts found 1534
Tier 2 Contractor | Tier 2 Package | Tier 2 Package Value | Contact email for procurement enquiries |
---|---|---|---|
MASON STREET FURNITURE | National Highways Billboards | £0m - £1m | [email protected] [email protected] |
MASON STREET FURNITURE | Supply & Installation of Traffic signs & Street Lighting works including Street Lighting Survey & Street Furniture Removal | £0m - £1m | [email protected] [email protected] |
Matiere SAS | Providing Professional and Specialist Knowledge in preparation of proposals for supply and installation of Green Tunnel PCC sections, waterproofing and associated works. | £0m - £1m | [email protected] |
Matiere UK Limited | Installation of Green Tunnels Incl Insitu Works | £50m - £100m | [email protected] |
MATRIX BOOKING | Desk & Car Park Allocation System | £0m - £1m | |
Maurer (UK) Limited | Design, Supply and installation of Expansion Joints for the 5 viaducts | £0m - £1m | [email protected] |
MAWSLEY MACHINERY | MEWP | £0m - £1m | [email protected] |
MAWSLEY MACHINERY | Telehandlers Phase 2 | £1m - £10m | [email protected] |
MAXWELL GEOSYSTEMS UK | I&M Software & Database | £0m - £1m | [email protected] |
Maylarch Environmental Ltd | Demolition of existing buildings including surveys and asbestos removal within T2G. | £0m - £1m | [email protected] [email protected] [email protected] |
McAllister Bros Limited | WP026.5.1 Utilities Design and Build - Sewer Lining - Area Central Lot 1 - Stage 1 Design and Construction Readiness | £1m - £10m | [email protected] |
McAllister Bros Limited | WP026.5.2 Utilities Design and Build - Sewer Lining - Area Central Lot 2 - Stage 1 Design and Construction Readiness | £1m - £10m | [email protected] |
McAllister Bros Limited | WP026.5.3 Utilities Design and Build - Sewer Lining - Area Central Lot 3 - Stage 1 Design and Construction Readiness | £1m - £10m | [email protected] |
McAuliffe Civil Engineerin Ltd | Routewide Framework for Remediation works. | TBC Fraework | [email protected] |
McAuliffe Civil Engineerin Ltd | Remediation Works A423 Banbury Road Overbridge | £0m - £1m | [email protected] |
McAuliffe Civil Engineerin Ltd | Remediation/removal of asbestos | £0m - £1m | [email protected] |
MCCALLS SPECIAL PRODUCTS LTD T/A MACALLOY | PSV - Temporary PT | £1m - £10m | [email protected] |
MCDERMOTT BUILDING AND CIVIL ENGINEERING | Steel Fixing - SD-RW - Attleboro Assets | £1m - £10m | [email protected] |
MCDERMOTT BUILDING AND CIVIL ENGINEERING | Steel fixing - SD/RW - Self Delivery and Retaining Wall – Birmingham Spur Dive Under | £10m - £50m | [email protected] |
MCFOUR | A5 Temp road diversions - Drainage | £0m - £1m | [email protected] |
McGee Group Holdings Ltd | Substation | £1m - £10m | |
MCGINLEY SUPPORT SERVICES (INFRASTRUCTURE) LIMITED | Sourcing, provision and site administration of temporary blue-collar labour resources on a call off basis, as a member of a multi supplier integrated labour desk, managing high volume of operatives required to support the EKFB self-delivered activities, including but not limited to drainage, FRC, earthworks, ground works & plant operatives. | £1m - £10m | [email protected] |
MCGINLEY SUPPORT SERVICES (INFRASTRUCTURE) LIMITED | Construction Labour Supply | £50m - £100m | [email protected] |
MCGINLEY SUPPORT SERVICES (INFRASTRUCTURE) LIMITED | Labour (Above) Ground | £10m - £50m | [email protected] [email protected] |
McManus Projects and Developments Limited | Invert Concrete and Drainage Labour | £1m - £10m | [email protected] |
McManus Projects and Developments Limited | Permenant Walkways (NTE and NTW) - Labour and Formwork | £1m - £10m | [email protected] |
McManus Projects and Developments Limited | TBM Labour Fitters (Area West) | £1m - £10m | [email protected] |
McManus Projects and Developments Limited | Temporary Propping | £0m - £1m | [email protected] |
McNealy Brown Limited | Steelwork Framework | £0m - £1m | [email protected] |
McNealy Brown Limited | Metalwork - West Ruislip Attentuation Tank Package Order | £0m - £1m | [email protected] |
MGF TRENCH CONSTRUCTION SYSTEMS | Utility Bridge | £0m - £1m | [email protected] |
MIDLAND DESIGN GROUP | CAD Support | £0m - £1m | |
Millcroft Services PLC | Scaffolding (Area Central) | £0m - £1m | [email protected] |
Millennium Personnel Services Ltd | PSV - Specialist labor for swivel crane operation | £1m - £10m | [email protected] |
MineArc Europe LTD | Service and Maintenace of TBM Refuge Chambers | £0m - £1m | [email protected] |
MINEARC SYSTEMS | TBM Toilet Block | £0m - £1m | [email protected] |
MITCHELL BRIDGES | Temporary Footbridge | £0m - £1m | [email protected] |
Mitchell Bridges Ltd | temporary bridge hire | £1m - £10m | [email protected] |
MK4 (MEKANO4) | Diddington Lane Overbridge Bearings | £0m - £1m | [email protected] |
MODERN PLANT HIRE | DB Schenker Relocation | £0m - £1m | [email protected] |
MOLSON COMPACT EQUIPMENT | Wheel Loader 19T | £0m - £1m | [email protected] |
MOTT MACDONALD SYSTRA JV | Noise, Vibration, Air Quality & Meteorological Monitoring - Interim | £0m - £1m | [email protected] [email protected] |
MPB STRUCTURES | FRC (Formwork, Reinforcement & Concrete) Works - Saltley Section | £10m - £50m | [email protected] |
MPB STRUCTURES | FRC (Formwork, Reinforcement & Concrete) Works - Washwood Heath Section | £10m - £50m | [email protected] |
MPB Structures | Substructure | £10m - £50m | |
MPB STRUCTURES | BROT West Portal: Internal Structures-Civil Works | £1m - £10m | [email protected] |
MPB STRUCTURES | FRC Package F.1 | £1m - £10m | [email protected] |
MPB STRUCTURES | Marston Box FRC Package | £1m - £10m | [email protected] |
MPB STRUCTURES | Washwood Heath Permanent Brook Diversion & Associated Work | £1m - £10m | [email protected] |
MS | BROM Slurry Treatment Plant (STP) | £1m - £10m | [email protected] |