Indirect contract opportunities
We publish information on key awarded tier 2 subcontracts within our supply chain and encourage interested suppliers to get in touch using the contact details provided.
We also publish details of live and upcoming subcontract procurements to be undertaken by our tier 1 contractors, to provide early visibility of opportunities to the market.
Apply for live indirect contract opportunities on CompeteFor
Downloadable tier 2 awarded contracts AND tier 1 contractor procurement pipeline
Indirect contracts found 1534
Tier 2 Contractor | Tier 2 Package | Tier 2 Package Value | Contact email for procurement enquiries |
---|---|---|---|
SOCIÉTÉ D'ETUDES ET DE RÉHABILITATION STRUCTURES (S.E.R.S.) | PSV - Complex Temporary Works Design | £0m - £1m | [email protected] |
SOCIÉTÉ D'ETUDES ET DE RÉHABILITATION STRUCTURES (S.E.R.S.) | Segment shop drawings booklet | £0m - £1m | [email protected] |
SOCOTEC MONITORING UK LIMITED | I&M Streethay Retaining Structure | £0m - £1m | [email protected] |
SOCOTEC MONITORING UK LIMITED | Instrumentation monitoring and reporting - Small Dean South Embankment & Stoke Mandeville South Embankment. | £0m - £1m | [email protected] |
SOCOTEC MONITORING UK LIMITED | the provision of all management, labour, materials, plant (including fuel), equipment and installation of that equipment, supervision, access and other resources necessary and ancillary to obtain baseline data, active monitoring and reporting of the Small Dean Cutting earthworks | £0m - £1m | [email protected] |
SOCOTEC MONITORING UK LIMITED | the provision of all management, labour, materials, plant (including fuel), equipment and installation of that equipment, supervision, access and other resources necessary and ancillary to obtain baseline data, active monitoring and reporting of the Waddesdon South Cutting earthworks | £0m - £1m | [email protected] |
SOCOTEC MONITORING UK LIMITED | C3 North Detailed Design Ground Investigation | £1m - £10m | [email protected] |
SOCOTEC MONITORING UK LIMITED | Air Quality Dust & Emissions Monitoring | £1m - £10m | [email protected] [email protected] |
SOCOTEC MONITORING UK LIMITED | Structural Health Monitoring (Tunnel Segments) | £1m - £10m | [email protected] |
SOIL ENGINEERING GEOSERVICES | Ground Investigation Stage 2 - North (Sublot 5, 6, 7, 8) | £10m - £50m | [email protected] |
SoilSafe Ltd | The testing and measurement of Rayleigh Wave Velocity through Continuous Surface Wave testing. | £1m - £10m | [email protected] |
Soletanche Bachy Balfour Beatty SB3 | HS2 Box D wall and Pilling | £50m - £100m | [email protected] |
Sorba | GRC Cladding to Amersham Shaft Headhouse | £1m - £10m | [email protected] |
SOUTHDOWNS ENVIRONMENTAL CONSULTANTS LIMITED | Framework to provide Noise Vibration and Air Quality Monitoring | £1m - £10m | [email protected] |
SOUTHDOWNS ENVIRONMENTAL CONSULTANTS LIMITED | Noise and Vibration Monitoring | £1m - £10m | [email protected] |
Southern Ecological Solutions Limited | Ecology Transfer | £1m - £10m | [email protected] |
Southern Ecological Solutions Limited | Arboriculture Survey & Support | £0m - £1m | [email protected] |
Southern Ecological Solutions Limited | Ecological Works | £0m - £1m | [email protected] |
Southern Ecological Solutions Limited | Meshing and installation of one-way gates; monitoring 21 days check/visit approx. every three days; closure by hard blocking (using site won materials or bentonite clay) or excavation. Mesh will be laid around each entrance hole to a maximum of 2m from the entrance hole. | £0m - £1m | [email protected] |
SpaceForm Technologies Ltd | Video Streaming | £0m - £1m | |
SPECIAL EVENT SERVICES | BBV Mobile Unit | £0m - £1m | [email protected] |
SPECIALIST PLANT ASSOCIATES | BROT IS - Ventilation | £0m - £1m | [email protected] |
SPECIALIST PLANT ASSOCIATES | Hyperbaric Equipment Supply/Hire | £0m - £1m | [email protected] |
SPEEDY ASSET SERVICES | LIW & BROM Lifting and pressure vessel insurance inspection | £0m - £1m | [email protected] |
SPEEDY ASSET SERVICES | WWH AQMS | £0m - £1m | [email protected] |
SPI Piling Ltd | Sheet Piling works | £0m - £1m | [email protected] |
SPI Piling Ltd | Rocky Lane - Sheet Piling & Ground Anchors | £0m - £1m | [email protected] |
SPI Piling Ltd | Supply and installation of sheet piling | £0m - £1m | [email protected] |
SPILLARD | Human Form Recognition Excavators & Tractors | £0m - £1m | [email protected] |
SSVH – SOCIÉTÉ SAVOISIENNE DE VÉRINS HYDRAULIQUES | Hydraulic Jacks and Elements | £0m - £1m | [email protected] |
STAINES HIRE | Water Bowsers | £0m - £1m | [email protected] |
STANTEC UK | Water Monitoring Resource | £0m - £1m | [email protected] |
Stanton Bonna Concrete Limited | Study into manufacturing facilities needed for production of green tunnel PCC Segments | £0m - £1m | [email protected] |
Stanton Precast Limited | Supply of precast arch segments | £100m - £250m | [email protected] |
STEEL & GLASS SOLUTIONS LIMITED | Amersham Gates | £1m - £10m | [email protected] |
STEEL & GLASS SOLUTIONS LIMITED | Metalwork and Cladding - Copthall Package Order | £1m - £10m | [email protected] |
STEEL & GLASS SOLUTIONS LIMITED | Steelwork Framework | £0m - £1m | [email protected] |
Steel Construction Limited | Commercial Store and TBM Shed | £0m - £1m | |
Stonewest Limited | Asset Protection and Mitigation - Heritage Buidlings and Monuments - Framework | £0m - £1m | [email protected] |
Stormwater Management Ltd | Supply and install pond liners | £0m - £1m | [email protected] |
Stortford Interiors (UK) Limited | Black Arrow House Office Fit Out | £0m - £1m | [email protected] |
Stortford Interiors (UK) Limited | WET, Breadbin and Mandeville Road Office Fit Out | £1m - £10m | [email protected] |
Stuart Group Ltd | Greatworth pump testing | £0m - £1m | [email protected] |
STUART WELLS LIMITED | Dewatering Newton Purcell & A4421 Overbridge | £0m - £1m | [email protected] |
STUART WELLS LIMITED | Well Drilling - River Leam, Avon Viaduct & Stoneleigh Pump Tests | £1m - £10m | [email protected] |
STUART WELLS LIMITED | De-watering (Fulfen Wood) | £0m - £1m | [email protected] |
STUART WELLS LIMITED | LIW South Portal – Active Wells in TBM Breakout Box | £0m - £1m | [email protected] |
STUART WELLS LIMITED | Drilling and pump tests | £1m - £10m | [email protected] |
SUMMOP 86 | Diabolo deviator tubes | £0m - £1m | Christophe LEVEQUE |
Sunbelt Rentals Limited | Small Plant and Tools Hire | £1m - £10m | [email protected] [email protected] |