Notice of culvert surveys at Breakspear Road South and Harvil Road – Showing Harvil Road location.

Work item: HS2-EW-SCS-Ph1-Ar-So-S2- Prog- works-3-02/07/2021

Work Item Summary

Project Phase
Phase 1
Region
Hillingdon
Location
Breakspear Road South, Harvil Road
Contractor
SCS JV
Type of works
Utility works / surveys
Estimated Start Date
12/07/2021
Estimated End Date
30/07/2021

What we are doing

What we are doing
From 12 to 30 July 2021, we will be carrying out overnight surveys along Breakspear Road South and Harvil Road, in the area shown on the map overleaf. This will help to inform our design decisions in the area.

We will capture 3-dimensional information on the drainage ditches and culverts in the area using a CCTV camera mounted on a small robot. Should we find a blockage, we may need to flush the drainage system using a high pressure water jet to carry out the investigation.

These surveys are taking place between 8pm and 5am to minimise impacts on the local road network. Temporary traffic management will be in place to ensure the surveys can be carried out safely and will be removed at the end of each shift.

Your utility services will not be affected.

Survey duration
– Breakspear Road South from 12 to 16 July
– Harvil Road from 26 to 30 July

Download information relating to these works

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]