Update Notice of CCTV surveys at Mandeville Road

Work item: HS2-EW-SCS-Ph1-Ar-So-S1-UT-21-23/03/2021_02

Work Item Summary

Project Phase
Phase 1
Region
Brent and Ealing
Location
Northolt
Contractor
SCS JV
Type of works
Utility works / surveys
Estimated Start Date
07/05/2021
Estimated End Date
08/05/2021

What we are doing

What we are doing
We wrote to you previously to advise you that we would be carrying out utility works from 10 to 11 April and 17 to 18 April 2021. However, we have rearranged these dates and the works will now take place on 7 and 8 May 2021.

We will be carrying out night-time utility surveys under the railway lines at Mandeville Road, shown on the map overleaf. These surveys will provide us with information on the condition and location of the utility services and help us to decide how best to protect them while we are building HS2.

We will investigate the condition of the sewer system using a CCTV camera mounted on a small robot. Should we find a blockage, we may need to flush investigation.