Update Notice of CCTV surveys at Mandeville Road
Work item: HS2-EW-SCS-Ph1-Ar-So-S1-UT-21-23/03/2021_02
Work Item Summary
- Project Phase
- Phase 1
- Region
- Brent and Ealing
- Location
- Northolt
- Contractor
- SCS JV
- Type of works
- Utility works / surveys
- Estimated Start Date
- 07/05/2021
- Estimated End Date
- 08/05/2021
What we are doing
What we are doing
We wrote to you previously to advise you that we would be carrying out utility works from 10 to 11 April and 17 to 18 April 2021. However, we have rearranged these dates and the works will now take place on 7 and 8 May 2021.
We will be carrying out night-time utility surveys under the railway lines at Mandeville Road, shown on the map overleaf. These surveys will provide us with information on the condition and location of the utility services and help us to decide how best to protect them while we are building HS2.
We will investigate the condition of the sewer system using a CCTV camera mounted on a small robot. Should we find a blockage, we may need to flush investigation.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]