Update: Launch pit excavations, reinforced concrete works and micro-tunnelling on Wormwood Scrubs

Work item: HS2-MW-BBVS-Ph1-OOC-St-S4-prog-works-46-18/08/2022

Work Item Summary

Project Phase
Phase 1
Region
Old Oak and North Acton
Location
Old Oak Common lane
Worksite Name
Old Oak Common
Contractor
BBVS JV
Type of works
Excavation works, Tunnelling
Estimated Start Date
25/07/2022
Estimated End Date
17/10/2022

What we are doing

Excavation and Reinforced Concrete Works in Wormwood Scrubs

We previously notified you that we are continuing our work to divert utilities along Old Oak Common Lane by installing eight micro tunnels from the Wormwood Scrubs site up to the main compound. You can find out more about our works, including our works updates here.

We have now excavated the launch and reception chamber to prepare the area to launch and receive the micro-tunnelling machine. As part of this work, we have also installed concrete structures in the chamber to enable the micro-tunnelling to be carried out.

Update on micro-tunnelling works in Wormwood Scrubs

The launch chamber is now complete, and we have installed two of the eight micro-tunnels, which will run from the launch chamber in Wormwood Scrubs site underneath the railway tracks to the reception chamber in the main site. These micro-tunnels will be used to divert the services along Old Oak Common Lane. This diversion is needed to allow us to lower Old Oak Common Lane that is planned in the future.