Vegetation work – Quainton Road
Work item: FUS_AWN_0205 HS2-EW-Fusion -Ph1-Ar-Ce-C2-Eco-21-16/04/2021
Work Item Summary
- Project Phase
- Phase 1
- Region
- Buckinghamshire
- Location
- Quainton
- Contractor
- Fusion JV
- Type of works
- Environmental mitigation works, Vegetation clearance
- Estimated Start Date
- 26/04/2021
- Estimated End Date
- 29/04/2021
What we are doing
Ahead of the main construction works in the area around Quainton Road, we need to carry out ecology surveys and vegetation / tree clearance along the highway boundary. As some of these works will need to be carried out on or adjacent to the carriageway we will need to put in place two-way temporary traffic lights between 9.30 and – 3pm, the road will open as normal outside of these times.
The works will take place between 26 – 28 April 2021.
Please refer to the map overleaf that shows the working areas.
To reduce the impact of these works, the works previously advertised on Fielders Field Road during April have been postponed and there will only be a full one day closure on the 29 April 2021, 8am to 5pm. These survey works have been co-ordinated with the works on Quainton Road to limit the impact to the local community. Further works are still required on Fiddlers Field Road and we will keep you updated.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]