Work Item Summary
- Project Phase
- Phase 1
- Region
- Brent and Ealing, London
- Location
- Hanger Lane, West Gate
- Worksite Name
- Westgate Vent Shaft and Headhouse
- Contractor
- SCS JV
- Type of works
- Construction
- Estimated Start Date
- 14/04/2025
- Estimated End Date
- 31/08/2027
What we are doing
We are continuing to build the ventilation shaft and headhouse at Westgate until August 2027. The ventilation shaft will allow air to flow in and out of the railway tunnel below. The headhouse is the building on top of the ventilation shaft which contains fire control and ventilation systems.
Works to connect the ventilation shaft to the tunnel will take place during the year.
You may notice some construction noise. We will use mitigation measures to reduce impacts where possible.
Our core working hours: 8am to 6pm Monday to Friday, 8am to 1pm on Saturdays. We may be on site for an hour at the start and/or at the end of each shift.
Update: Concrete pour work on Sunday 17 May
As part of this work, we need to line the underground structures with concrete.
Concrete will be delivered to site between 7 and 8 am on Sunday 17 May. The concrete will be poured within the underground structures between 8am and 1pm. This work is not expected to be noisy.
Download information relating to these works
- Notice of Sunday 17 May work at the Westgate Vent Shaft, Hanger Lane
- Westgate Vent Shaft site works update