Notice of survey works along the River Pinn
Work item: HS2-MW-SCS-Ph1-Ar-So-S1-Prog-works-39-22/09/2023
Work Item Summary
- Project Phase
- Phase 1
- Region
- Hillingdon
- Location
- River Pinn
- Worksite Name
- West Ruislip
- Contractor
- SCS JV
- Type of works
- Topographical surveys
- Estimated Start Date
- 02/10/2023
- Estimated End Date
- 30/10/2023
What we are doing
What we are doing
Throughout October 2023, we will be working in the area immediately to the south of the Chiltern Line Bridge along the banks of the River Pinn. We will be carrying out topographical surveys that will assist our understanding and design of the River Pinn realignment.
This activity will require a small team of operatives working on the banks and in the river taking surveys of the topographical features of the river and its banks.
It may require a small amount of strimming to allow line of sight from one side of the river to the other.
We would like to apologise in advance for any advance for any disruption or inconvenience this may cause. Every effort is made to ensure that these works will be carried out in the least impactful way.