Installation of traffic cameras on Greenford Road
Work item: HS2-EW-SCS-Ph1-Ar-So-S2-Traf-6-01/03/2023
Work Item Summary
- Project Phase
- Phase 1
- Region
- Brent and Ealing, London
- Location
- Greenford Road
- Contractor
- SCS JV
- Type of works
- Monitoring equipment
- Estimated Start Date
- 21/03/2023
- Estimated End Date
- 21/03/2023
What we are doing
On 21 March 2023, we will be installing traffic management cameras in four locations on Greenford Road. The cameras will be installed onto existing lamp columns via a mobile platform from either a bus lane, cycle lane, pedestrian footway, or parking bay (location dependent).
The cameras will help us monitor lorry movements and ensure we keep within the levels agreed with the local authority. The system has been developed to monitor only those vehicles being used for HS2, and no information relating to other road users will be captured. The cameras will be in place for the duration of the HS2 works.
The installations will take place between 8am to 6pm and will take around two hours. We will use noise reducing barriers where possible to help minimise any noise disruption to the local community, working as efficiently as possible whilst keeping our work areas safe and tidy.
How this might affect you
To ensure the safety of the public and our staff, temporary changes will
be in place at each installation location, detailed below:
- Greenford Road (Green Park Way) A – Narrowed Lane and a
partial footway closure - Greenford Road (Green Park Way) B – Narrowed Lane and a
partial footway closure - Greenford Road (Daryngton Drive) A – Narrowed Lane, a partial
footway closure and parking bay suspensions. Bus stop
suspended – Ingram Way Bridge Hotel (Stop GG) - Greenford Road (Daryngton Drive) B – Narrowed Lane, a partial
footway closure and parking bay suspensions
Download information relating to these works
Find out more about
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]