Overnight road closures on Coleshill Heath Road
Work item: HS2-MW-BBV-Ph1-Ar-No-N1-Prog-works-07-24/04/2023
Work Item Summary
- Project Phase
- Phase 1
- Region
- Solihull
- Location
- Coleshill Heath Road
- Contractor
- BBV JV
- Type of works
- Overnight road closure
- Estimated Start Date
- 19/05/2023
- Estimated End Date
- 20/05/2023
What we are doing
The new railway will be elevated on an embankment as it passes over Coleshill Heath Road. To ensure that our work does not affect the supply, a number of utilities needed to be diverted. In order to do this, a one-way system and temporary 30mph speed limit was introduced on 3 April 2023. We will be be ready to fully reopen this road and remove the temporary speed limit on 19 May 2023. We will need to close this section of Coleshill Heath Road for one night while we remove the temporary safety barrier that was installed in the middle of the carriageway. The road will be closed from 9pm until 6am the following morning. Traffic will be diverted via the Chester Road, Birmingham Road, and Stonebridge Road. See the map for more detail.
Download information relating to these works
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]